![](https://kelington-group.com/wp-content/uploads/2022/05/fb.jpg)
EQUIPMENT FABRICATION
EQUIPMENT FABRICATION
YEAR | JOB DETAILS | LOCATION |
---|---|---|
2016 | Liquid Ethylene Oxide (EO) and Liquid Carbon Dioxide (CO2) filling plant : Equipment erection, supply and install piping system. | Kulim, Malaysia |
YEAR | JOB DETAILS | LOCATION |
---|---|---|
2012 | Liquifier unit equipment erection and piping installation | Melaka, Malaysia |