Facilities Hook Up

Facilities Hook Up


A base build is the “back bone” capacity of the overall system, linking chemical and gas supply to be distributed throughout the entire plant. The hook up occurs at the last stage of installation delivery where engineers connect the base build to the corresponding process tools. By managing and coordinating all aspects of the hook up process, we adhere to time schedules and budgetary costs for a seamless plant start-up and qualification.

Project References

.
Infineon Technologies (Kulim) Sdn Bhd
YEAR JOB DETAILS LOCATION
2006 Turnkey Tool Hook up – Bulk gas, specialty gas, ultra pure water, exhaust,
process drain, vacuum, chemical system hook up
Kulim, Malaysia
B.Braun Medical Industries Sdn Bhd
YEAR JOB DETAILS LOCATION
2015-2016 Supply and install mechanical piping, inclusive CDA, water supply,
steam line and equipment installation
Penang, Malaysia
Sunpower
YEAR JOB DETAILS LOCATION
2015-2016 Supply and Installation of Toxic Gas Monitoring System
and Specialty Gas Piping System
Binan, Laguna, Philippines
The world largest chip manufacturer
YEAR JOB DETAILS LOCATION
2016 Gas Hook Up Dalian, China
Q-Cells Malaysia Sdn Bhd
YEAR JOB DETAILS LOCATION
Hook up for DI Water, drain, PVAC, Hi-Vac & Gases. Cyberjaya, Malaysia
Taiwan Apple LLC
YEAR JOB DETAILS LOCATION
2015 Bulk and Specialty gas system installation. Gas Monitoring and Detection
System. Safety Improvement System
Taiwan
Semiconductor Manufacturing International Corporation (SMIC)
YEAR JOB DETAILS LOCATION
2014 Supply and install gas 10K hook up system Shenzhen, China
Western Digital
YEAR JOB DETAILS LOCATION
2011 Bulk Solvent Delivery System & Piping Distribution for Hardisk Media. Penang, Malaysia
REC WST Wafer
YEAR JOB DETAILS LOCATION
2009 Installation of slurry import & export system to wafer building Tuas South, Singapore